Microcement floors for condos: renovating without demolition

The biggest benefit in a condo is what you avoid: breaking out tile, debris in the lift and noise for the neighbours.

By Kret · Updated 2 Nov 2026 · 3 min read
Chao Phraya Clay microcement floor in a living room
Design inspiration · Floor · Chao Phraya Clay
Short answer

Microcement can renew a condo floor without taking up the tiles, as long as they are firmly bonded. It adds only 2–3 mm, so doors usually still fit. Get juristic person approval first, and check the tiles before you commit.

Why it suits condos

  • Less noise. There is no breaking out, which is the loudest stage of a floor renovation.
  • Little debris. Less waste has to go down the service route.
  • Almost no height change. At 2–3 mm, thresholds and doors usually stay as they are.
  • Faster turnaround. That matters for rental units.

What the job looks like

StageWhat happensNoise and mess
SurveyTap tiles, check levels, measureNone
ProtectionCover joinery, doors and fittingsLow
PreparationClean, grind and fill grout linesModerate, dust from grinding
Base coatsPrime, mesh and base layersLow
Finish coatsTrowel, then sand between coatsLow to moderate
SealingSeveral coats of sealerSome odour, ventilate well
CuringKeep off, then light useNone

Grinding is the noisiest stage, so ask when it falls and plan it inside your building’s permitted hours. It is still far quieter and shorter than breaking out tile.

Check the floor first

The base decides the result. Microcement can go over tile after checking for cracks, grinding the surface and applying mesh.1 Tap each area and listen for hollow tiles. If a large part of the floor sounds hollow, take it up, because loose tile will show through later.

Before work starts

Every building has its own rules, so start with your juristic person. Thai guidance for condo owners says to:2

  • Get approval first, and submit your renovation plans.
  • Check the permitted work hours. One example given is 10:00–18:00, but each condo sets its own.
  • Use only the designated route for materials.
  • Tell neighbours in writing, with the expected duration.

Plan around curing

Allow for drying. One UK guide says to leave 48 hours after the final sealer before light use, and to protect the floor for a further five days.1 Ask your installer for the figures for your system, and keep the unit empty if you can.

Check where the water goes

Living areas are simple. Bathrooms, kitchens and balconies are not. Keep the existing waterproofing intact, and read Can microcement go in a shower? before including a wet room.

Which rooms to include

AreaInclude?Why
Living and diningYesSimplest area, and the biggest visual change
BedroomsYesIf the floor is tile. Laminate must come up first
Kitchen floorYes, with careGrit, oil and dropped pans
BathroomWith careKeep the waterproofing intact
BalconyNoGenerally not considered suitable outdoors1

Thinking about rental or resale

A calm, light floor photographs well and suits most furniture. Tenants are harder on floors than owners, though, so set the rules early: felt pads, no dragging and a note about cleaning products. See How to clean and care for microcement. In a rental, a sealer check between tenancies is cheap compared with a repair.

What to prepare for your juristic person

  • Your floor plan and the areas to be finished.
  • The contractor’s details and the crew list, if the building needs one.
  • The expected start and end dates.
  • How debris will leave the building.
  • Proof that no structural or waterproofing work is included, if that is the case.

Finally, tell your neighbours again the day before grinding starts. A short, friendly note costs nothing, and it often prevents a complaint to the juristic person.

Questions

Will it reduce noise to the unit below?

No. A 2–3 mm coating does not add sound insulation, and removing a floating floor can make footsteps louder.

Can it go over vinyl or laminate?

No. Those need removing, because microcement needs a solid, stable base.1

Do I need to move out?

Check with your installer. Dust, sealer curing and floor access usually make it easier to leave the unit empty.

How long does a condo floor take?

It depends on area and preparation. Published bathroom jobs run about 5–7 working days, and a floor also needs curing time.31

Sources

  1. Homebuilding & Renovating: Microcement flooring
  2. KBank Live: How to renovate a condo (Thai)
  3. ELF Decor: Microcement bathrooms in Melbourne

Hold microcement before you specify it.

Hand-made samples in your colours, delivered to your studio. For larger projects we trowel a full-size panel on site.